Pengadaan BMD Januari s/d November Tahun 2016

Berita Utama () 29 Desember 2016 08:54:59 WIB
DAFTAR REALISASSI PENGADAAN BARANG MILIK DAERAH | |||||||||||
DARI BULAN JANUARI S/D NOVEMBER 2016 | |||||||||||
SKPD : BADAN PEMBERDAYAAN MASYARAKAT | |||||||||||
KAB.KOTA : PADANG | |||||||||||
PROVINSI : SUMATERA BARAT | |||||||||||
No. | Nama Barang Yang Dibeli | Merk/Type | SPK Perjanjian/Kontrak | DPA/SPM/ Kwitansi | Jumlah | Dipergunakan pada Unit | Ket | ||||
Tanggal | Nomor | Tanggal | Nomor | Banyaknya Barang | Harga Satuan | Jumlah Harga | |||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
A. | Pengadaan Laptop, Komputer PC dan Printer | 17-Feb-16 | 020/90/SPK/BPM-2016 | 29-Feb-16 | 223/SP2D/LS/2016 | 84.030.000 | |||||
1. | Laptop | HP Notebook 240 GA (69PT) | 3 | 12.480.000 | 37.440.000 | 1 Kepala Badan, 1 Sekretaris, 1 Kasubag Umum | |||||
2. | Komputer PC | HP Pavilion 20-r124d All In One | 3 | 12.030.000 | 36.090.000 | 1 Staf Sekretariat, 1 Staf Bidang UEM, 1 Staf Bidang Sosbud | |||||
3. | Printer | Epson L355 | 3 | 3.500.000 | 10.500.000 | 1 Staf Sekretariat, 1 Staf Bidang UEM, 1 Staf Bidang Sosbud | |||||
B. | Pengadaan Alat Kantor Lainnya | 17-Feb-16 | 020/89/SPK/BPM-2016 | 29-Feb-16 | 02/293/SPJ/BPM-2016 | 41.975.000 | |||||
4. | Mesin Potong rumput | Tanaka SUM 328 SE II | 1 | 5.975.000 | 5.975.000 | 1 Gudang | |||||
5. | AC Split 2 PK | Panasonic CSPN 18 RKP | 3 | 10.000.000 | 30.000.000 | 1 Sekretariat, 1 Bidang UEM, 1 Bidang Sosbud | |||||
6. | Mesin Absen | Fingerprint | 1 | 6.000.000 | 6.000.000 | Halaman | |||||
C. | Pengadaan Peralatan Studio Visual berupa Pengadaan TV dan CCTV | 21-Mar-16 | 020/163/SPK/BPM-2016 | 06-Apr-16 | 437/SP2D/LS/2016 | 102.370.000 | |||||
7. | Televisi | - Sharp LC-55 LE 460X | 1 | 16.930.000 | 16.930.000 | Diklat BPM | |||||
-Toshiba, LED 50L 5550 | 1 | 17.980.000 | 17.980.000 | Ruang Kepala Badan | |||||||
8. | CCTV | NVR Hikvision DS-7716 NI-E4 | 1 | 67.460.000 | 67.460.000 | Halaman | |||||
D. | Pengadaan Alat Kantor Lainnya | 19-Apr-16 | 04/203/SPJ/BPM-2016 | 29.700.000 | |||||||
9. | Filling Kabinet | LION 45 | 2 | 4.000.000 | 8.000.000 | 2 Ruang Kepala Badan | |||||
10. | Pompa Air | Sanyo P-H130B | 2 | 2.000.000 | 4.000.000 | 1 Halaman, 1 Diklat BPM | |||||
11. | Vacum Cleaner | Lux Kobold Royal 3 | 1 | 17.700.000 | 17.700.000 | 1 Gudang | |||||
E. | Pengadaan Kendaraan Dinas Bermotor Perorangan | 11-Apr-16 | 020/226/SPK/BPM-2016 | 22-Apr-16 | 646/SP2D/LS/2016 | 206.820.000 | |||||
12. | Kendaraan Roda 4 | Toyota Grand New Avanza Veloz 1,5 M/T VIN 2016 | 1 | 206.820.000 | 206.820.000 | Halaman | |||||
F. | Pengadaan Kendaraan Dinas Bermotor Perorangan | 14-Apr-16 | 020/242/SPK/BPM-2016 | 03-Mei-16 | 785/SP2D/LS/2016 | 388.676.500 | |||||
13. | Kendaraan Roda 4 | Mitsubishi Triton, 2,5 L DC Exceed 4 x 4 M/T Assy Year 2016 | 1 | 388.676.500 | 388.676.500 | Halaman | |||||
G. | Pengadaan Sound System berupa Pengadaan Keyboard/Sound System | 09-Jun-16 | 020/474/SPK/BPM-2016 | 29-Jul-16 | 1890/SP2D/LS/2016 | 194.000.000 | Gedung Diklat | ||||
14. | Keyboard/Orgen | Yamaha PSR 970 | 1 | 17.600.000 | 17.600.000 | ||||||
15. | Mixer | Digital Soundcraft 1 16 | 1 | 10.800.000 | 10.800.000 | ||||||
16. | Ipad | Axio | 1 | 2.750.000 | 2.750.000 | ||||||
17. | Equalizer | DBX 231 | 1 | 4.450.000 | 4.450.000 | ||||||
18. | Speaker Management | X Over Drive Rack Pa 2 | 1 | 10.850.000 | 10.850.000 | ||||||
19. | Power Vissioner | P9500 | 2 | 9.100.000 | 18.200.000 | ||||||
20. | Mic | Wireless | 2 | 3.600.000 | 7.200.000 | ||||||
21. | Mic Kabel | Shure Sm 58 | 6 | 1.950.000 | 11.700.000 | ||||||
22. | Speaker Custom | 38.000.000 | |||||||||
Speaker | Craft 12" | 8 | 1.900.000 | 15.200.000 | |||||||
Twiter | Crimson CR x 18 | 4 | 2.050.000 | 8.200.000 | |||||||
Box | 4 | 3.650.000 | 14.600.000 | ||||||||
23. | Speaker Custom | 33.000.000 | |||||||||
Speaker | Craft 18" | 4 | 4.600.000 | 18.400.000 | |||||||
Box | 4 | 3.650.000 | 14.600.000 | ||||||||
24. | Speaker Aktif | 12" DB Cromo | 2 | 8.000.000 | 16.000.000 | ||||||
25. | Harkes | 2 | 2.750.000 | 5.500.000 | |||||||
26. | Harkes Keyboard | 1 | 2.750.000 | 2.750.000 | |||||||
27. | Stand Mic | 2 | 650.000 | 1.300.000 | |||||||
28. | Stabilizer | Okki | 1 | 5.000.000 | 5.000.000 | ||||||
29. | Kabel Setting | 1 | 8.900.000 | 8.900.000 | |||||||
H. | Pengadaan Alat Kantor Lainnya berupa Pengadaan Genset dan Kerangkeng | 09-Jun-16 | 020/505/SPK/BPM-2016 | 08-Agu-16 | 2101/SP2D/LS/2016 | 194.500.000 | Halaman | ||||
30. | Genset | 50 KVA FAWDE 4DX23-65D | 1 | 191.000.000 | 191.000.000 | ||||||
31. | Kerangkeng | Besi 2500x950x1400 | 1 | 3.500.000 | 3.500.000 | ||||||
I. | Pengadaan Alat Rumah Tangga berupa Pengadaan Meubelair | 30-Sep-16 | 11/84/SPJ/BPM/2016 | 19.950.000 | Gedung Diklat | ||||||
32. | Meja Belajar | Tempahan | 1 | 19.950.000 | 19.950.000 | ||||||
J. | Pengadaan Alat Kantor Lainnya | 30-Sep-16 | 09/336/SPJ/BPM/2016 | 5.400.000 | 1 Ruang Kepala Badan, 1 Sekretariat | ||||||
33. | Mesin Penghancur Kertas | Ishred, OS-8M | 2 | 2.700.000 | 5.400.000 | ||||||
JUMLAH | 1.267.421.500 |